With the beautifully renovated bus station and Slough train station next door, The Future Works is extremely well-connected. London Paddington is a 16-minute train journey away and once the new Elizabeth Line (Crossrail) is active in 2019, Bond Street will be reachable in just 32 minutes. By 2024, the Western Rail Access to Heathrow (WRAtH) will connect the airport to Slough within 6 minutes.